Getting started on insulation
If you’ve got a real keen eye you noticed in the last post that I had started to add some framing in the wall cavities. The plan was to run 2*4s sideways between the posts then staple 24″ R18 Kraft faced insulation between them. Then ultimately hang plywood sheets sideways between the posts and to the 2*4s. I spent weekends working on framing and then started with insulation. I had a week of vacation to use by the end of March which I primary used working on the shop.