The Ceiling: Chapter 2
Happy Valentines Day! After finishing the back row of ceiling panels, I had 3 nights to prepare for S
Posts about the shop. Both building it and changes / upgrades made over time.
Happy Valentines Day! After finishing the back row of ceiling panels, I had 3 nights to prepare for S
Everything still looked like it did the night before at 7am when we got started. I had never worked w
With another winter approaching I was very motivated to get the ceiling done so I could have a heated
Now that I had access to the crawl space and the framing for the ceiling was in place I needed to get
Long before we bought the house a couple additions were added. We think the house was originally a 2
Up to this point I had setup the 4 post lifts to have the power units up front. I was temporally just
I took a couple days off work and worked with the contractor to get most of the nailers up in prepara
With the walls more or less done things were really starting to look…up. At this point my frien
I decided the floor on top of the inception shed was a little too spongy for my liking and the idea o
The inception shed started as a storage room and garden shed. We put up an actual garden shed over by